Peace River Hydro Partners

www.prhp.ca

Peace River Hydro Partners is a partnership between ACCIONA Infrastructure Canada Inc. and Samsung C&T Canada Ltd. PRHP holds the main civil works contract for the Site C Clean Energy Project. The MCW contract is valued at approximately $1.75-billion and includes the following key components: Earthfill dam: • Approximately 1,050 metres in length and 60 metres high above the riverbed • Construction of two temporary cofferdams across the main river channel to allow for construction of the earthfill dam Two diversion tunnels: • River diversion works, including construction of two 10.8 metre internal diameter concrete-lined tunnels between 700 metres to 800 metres in length Concrete foundation for generating station, spillways and dam buttress: • An 800-metre roller-compacted-concrete buttress to enhance seismic protection In addition, the main civil works contract includes significant ancillary works such as a permanent network of site roads, site drainage and debris handling facilities. Are you interested in joining a strong, united team that will accomplish amazing things? Visit the Site C website (www.sitecproject.com) for a detailed overview of this very large, Clean Energy project being built by our client – BC Hydro. More information on PRHP, including job opportunities can be found at: www.prhp.ca

Read more

Reach decision makers at Peace River Hydro Partners

Lusha Magic

Free credit every month!

Peace River Hydro Partners is a partnership between ACCIONA Infrastructure Canada Inc. and Samsung C&T Canada Ltd. PRHP holds the main civil works contract for the Site C Clean Energy Project. The MCW contract is valued at approximately $1.75-billion and includes the following key components: Earthfill dam: • Approximately 1,050 metres in length and 60 metres high above the riverbed • Construction of two temporary cofferdams across the main river channel to allow for construction of the earthfill dam Two diversion tunnels: • River diversion works, including construction of two 10.8 metre internal diameter concrete-lined tunnels between 700 metres to 800 metres in length Concrete foundation for generating station, spillways and dam buttress: • An 800-metre roller-compacted-concrete buttress to enhance seismic protection In addition, the main civil works contract includes significant ancillary works such as a permanent network of site roads, site drainage and debris handling facilities. Are you interested in joining a strong, united team that will accomplish amazing things? Visit the Site C website (www.sitecproject.com) for a detailed overview of this very large, Clean Energy project being built by our client – BC Hydro. More information on PRHP, including job opportunities can be found at: www.prhp.ca

Read more
icon

Country

icon

City (Headquarters)

Fort St. John

icon

Industry

icon

Employees

1001-5000

icon

Founded

2015

icon

Estimated Revenue

$250,000,000 to $500,000,000

icon

Social

  • icon

Employees statistics

View all employees

Potential Decision Makers

  • Director Health Safety

    Email ****** @****.com
    Phone (***) ****-****
  • Chief Power Engineer

    Email ****** @****.com
    Phone (***) ****-****
  • Carpenter

    Email ****** @****.com
    Phone (***) ****-****
  • Heavy Equipment Operator

    Email ****** @****.com
    Phone (***) ****-****

Technologies

(24)

Reach decision makers at Peace River Hydro Partners

Free credits every month!

My account

Sign up now to uncover all the contact details