Stadium Seating Enterprises, Inc.
www.stadiumseating.comStadium Seating Enterprises, Inc. (SSE) is the leading provider of permanent stadium seating systems in North America. SSE specializes in providing design, engineering and fabrication solutions for Cinemas, Churches, Educational Facilities and Performance Halls. The SSE PREFoam Stadium Seating Riser System is the fastest, easiest and most cost effective method of constructing stadium seating on the market today. • All steel and EPS components are pre-engineered to facilitate quick installation. • The system comes with a complete detailed set of shop/installation drawings illustrating each area to receive the PREFoam System; • The PREFoam System can typically be installed ready for topping concrete in as little as 1 - 1.5 days per auditorium; approximately 20% of the time required to install a light gauge metal frame and pan system; • The PREFoam System can easily accommodate the incorporation of space under the platforms; • The PREFoam System is delivered to the jobsite with all steel components precut to the dimensions of the Stadium platform criteria; • Given the time, material and labor savings, typically a SSE Stadium Seating Riser System can be installed for 20-25% less than conventional steel stud construction. • The EPS used in the SSE PREFoam System is especially valuable for "green" building projects because it is made of partially recycled materials and is recyclable at the end of a building’s useful life.
Read moreStadium Seating Enterprises, Inc. (SSE) is the leading provider of permanent stadium seating systems in North America. SSE specializes in providing design, engineering and fabrication solutions for Cinemas, Churches, Educational Facilities and Performance Halls. The SSE PREFoam Stadium Seating Riser System is the fastest, easiest and most cost effective method of constructing stadium seating on the market today. • All steel and EPS components are pre-engineered to facilitate quick installation. • The system comes with a complete detailed set of shop/installation drawings illustrating each area to receive the PREFoam System; • The PREFoam System can typically be installed ready for topping concrete in as little as 1 - 1.5 days per auditorium; approximately 20% of the time required to install a light gauge metal frame and pan system; • The PREFoam System can easily accommodate the incorporation of space under the platforms; • The PREFoam System is delivered to the jobsite with all steel components precut to the dimensions of the Stadium platform criteria; • Given the time, material and labor savings, typically a SSE Stadium Seating Riser System can be installed for 20-25% less than conventional steel stud construction. • The EPS used in the SSE PREFoam System is especially valuable for "green" building projects because it is made of partially recycled materials and is recyclable at the end of a building’s useful life.
Read moreCountry
State
California
City (Headquarters)
Laguna Niguel
Industry
Employees
1-10
Founded
2002
Estimated Revenue
$1,000,000 to $5,000,000
Social
Employees statistics
View all employeesPotential Decision Makers
Chairman of the Board
Email ****** @****.comPhone (***) ****-****Chairman of the Board of Directors
Email ****** @****.comPhone (***) ****-****Director of Technical Services
Email ****** @****.comPhone (***) ****-****Sales Manager
Email ****** @****.comPhone (***) ****-****
Technologies
(17)