Cranemaster

www.cranemaster.com

[ INCREASED OPERATIONAL WEATHER WINDOW ] [ REDUCED RISKS ] Cranemaster offers heave compensators and shock absorbers that secure offshore lifting operations. In addition we carry out lift analysis of all lifting phases, including lifts in air, splash zone crossing, subsea lowering and landing. Our aim is to give you a clear view of movements, velocities and forces in crane/winch and load for different wave conditions. [ OIL & GAS ] From large manifolds of more than 1000 t to light protection covers. We know dynamics challenges in all lifting phases and also how to reduce them! [ RENEWABLES ] Installation of monopiles, jacket foundations, templates, transition pieces and wave energy devices are some of the projects we have been involved in. Our advanced shock absorbers will reduce snap loads during pile runs to acceptable levels. [ SALVAGE ] Did you know our units were used in the Costa Concordia and Rena removal projects? With Cranemaster, you are ensured a safe and efficient wreck removal operation. [ DECOMMISSIONING ] Cranemaster will be a positive contribution to your decommissioning activities in reducing cost and increasing weather window for lifting operations.

Read more

Reach decision makers at Cranemaster

Lusha Magic

Free credit every month!

[ INCREASED OPERATIONAL WEATHER WINDOW ] [ REDUCED RISKS ] Cranemaster offers heave compensators and shock absorbers that secure offshore lifting operations. In addition we carry out lift analysis of all lifting phases, including lifts in air, splash zone crossing, subsea lowering and landing. Our aim is to give you a clear view of movements, velocities and forces in crane/winch and load for different wave conditions. [ OIL & GAS ] From large manifolds of more than 1000 t to light protection covers. We know dynamics challenges in all lifting phases and also how to reduce them! [ RENEWABLES ] Installation of monopiles, jacket foundations, templates, transition pieces and wave energy devices are some of the projects we have been involved in. Our advanced shock absorbers will reduce snap loads during pile runs to acceptable levels. [ SALVAGE ] Did you know our units were used in the Costa Concordia and Rena removal projects? With Cranemaster, you are ensured a safe and efficient wreck removal operation. [ DECOMMISSIONING ] Cranemaster will be a positive contribution to your decommissioning activities in reducing cost and increasing weather window for lifting operations.

Read more
icon

Country

icon

Industry

icon

Employees

11-50

icon

Founded

1983

icon

Social

  • icon

Employees statistics

View all employees

Potential Decision Makers

  • Board Member

    Email ****** @****.com
    Phone (***) ****-****
  • Chief Technology Officer

    Email ****** @****.com
    Phone (***) ****-****
  • Cranemaster

    Email ****** @****.com
    Phone (***) ****-****
  • Product Manager

    Email ****** @****.com
    Phone (***) ****-****

Technologies

(18)

Reach decision makers at Cranemaster

Free credits every month!

My account

Sign up now to uncover all the contact details