Early Power Limited (Bridge Power Project)

www.earlypowerltd.com

The Bridge Power Project is a 424 MW gas-fired generation project under development in Tema, Ghana, by Early Power Limited, a Ghanaian company. Early Power is sponsored by a multinational consortium comprised of Endeavor Energy, General Electric (GE) and Sage Petroleum Limited, all well-known in the energy sector for delivering sustainable, reliable and competitively-priced energy solutions in developing countries. To be located in the Tema Heavy Industrial Area, the project includes the development of power plant facilities in two stages: Stage 1 and Stage 2, a 9 km+ pipeline for transporting liquefied petroleum gas (LPG), an LPG storage tank farm, and additional pipelines for transporting raw water and diesel to the project site. The plant will generate electricity using LPG as its primary fuel. Within five years of it becoming operational, we anticipate that the plant will switch to Natural Gas (NG) as its primary fuel, should it be made available by the Government of Ghana. Diesel is the backup fuel in the event gas is unavailable. On completion of Stage 2, the full power plant output capacity will be approximately 424MW. The Project is being developed in two stages on an accelerated timeline and consists of the following: Stage 1: 202 MW power block consisting of 5 General Electric TM2500+ gas turbines and 1 purpose-built GE steam turbine in Combined Cycle Gas Turbine (CCGT) configuration Stage 2: 222 MW power block consisting of 4 General Electric LM6000 gas turbines and 1 purpose-built GE steam turbine in CCGT configuration

Read more

Reach decision makers at Early Power Limited (Bridge Power Project)

Free credit every month!

The Bridge Power Project is a 424 MW gas-fired generation project under development in Tema, Ghana, by Early Power Limited, a Ghanaian company. Early Power is sponsored by a multinational consortium comprised of Endeavor Energy, General Electric (GE) and Sage Petroleum Limited, all well-known in the energy sector for delivering sustainable, reliable and competitively-priced energy solutions in developing countries. To be located in the Tema Heavy Industrial Area, the project includes the development of power plant facilities in two stages: Stage 1 and Stage 2, a 9 km+ pipeline for transporting liquefied petroleum gas (LPG), an LPG storage tank farm, and additional pipelines for transporting raw water and diesel to the project site. The plant will generate electricity using LPG as its primary fuel. Within five years of it becoming operational, we anticipate that the plant will switch to Natural Gas (NG) as its primary fuel, should it be made available by the Government of Ghana. Diesel is the backup fuel in the event gas is unavailable. On completion of Stage 2, the full power plant output capacity will be approximately 424MW. The Project is being developed in two stages on an accelerated timeline and consists of the following: Stage 1: 202 MW power block consisting of 5 General Electric TM2500+ gas turbines and 1 purpose-built GE steam turbine in Combined Cycle Gas Turbine (CCGT) configuration Stage 2: 222 MW power block consisting of 4 General Electric LM6000 gas turbines and 1 purpose-built GE steam turbine in CCGT configuration

Read more
icon

Country

icon

City (Headquarters)

Accra

icon

Employees

11-50

icon

Social

  • icon

Employees statistics

View all employees

Potential Decision Makers

  • Plant Manager

    Email ****** @****.com
    Phone (***) ****-****
  • Commercial and Contracts Manager

    Email ****** @****.com
    Phone (***) ****-****
  • Project Assistant

    Email ****** @****.com
    Phone (***) ****-****
  • Staff Accountant

    Email ****** @****.com
    Phone (***) ****-****

Reach decision makers at Early Power Limited (Bridge Power Project)

Free credits every month!

My account

Sign up now to uncover all the contact details