Kapar Energy Ventures Sdn Bhd

www.kaparenergy.com.my

Kapar Energy Ventures Sdn Bhd is a subsidiary of Tenaga Nasional Berhad (60%) and Malakoff Corporation Berhad (40%). We are the second largest thermal power plant in Malaysia with the generating capacity of 2200 MegaWatt. We are located in Klang Valley, 56km west of Kuala Lumpur, off the coastal road between Port Klang and Kuala Selangor facing the straits of Malacca. We are the only power plant in Malaysia with triple fuel firing capability (gas, oil and coal). With this advantages, we are always inspire to be a reliable and available plant to support the National Grid system. We are committed in ensuring the environmental and sustainability on eco system are well maintained by enforcing, monitoring and controlling all the plant processes. The main attractions here during monsoon season is the power plant ash pond as a sanctuary for migratory birds stopping over from Siberia to Australia. Our core values are ICE (Integrity, Commitment and Excellence). KEV generating 2420MW which contribute 15% of the country's energy demand. Besides, it is the only power plant in Malaysia with triple fuel firing capacibility. Planning for the power plant started in late 1970 by NEB while the construction work commenced in 1981. It was constructed on a reclaimed mangrove swampland. The plant is officially opened by Sultan Selangor on 14/3/1987. After about 25 year of operation under LLN and TNB, KEV is formed and fully run as an IPP with the equity of 60% TNB and 40% Malakoff.

Read more

Reach decision makers at Kapar Energy Ventures Sdn Bhd

Lusha Magic

Free credit every month!

Kapar Energy Ventures Sdn Bhd is a subsidiary of Tenaga Nasional Berhad (60%) and Malakoff Corporation Berhad (40%). We are the second largest thermal power plant in Malaysia with the generating capacity of 2200 MegaWatt. We are located in Klang Valley, 56km west of Kuala Lumpur, off the coastal road between Port Klang and Kuala Selangor facing the straits of Malacca. We are the only power plant in Malaysia with triple fuel firing capability (gas, oil and coal). With this advantages, we are always inspire to be a reliable and available plant to support the National Grid system. We are committed in ensuring the environmental and sustainability on eco system are well maintained by enforcing, monitoring and controlling all the plant processes. The main attractions here during monsoon season is the power plant ash pond as a sanctuary for migratory birds stopping over from Siberia to Australia. Our core values are ICE (Integrity, Commitment and Excellence). KEV generating 2420MW which contribute 15% of the country's energy demand. Besides, it is the only power plant in Malaysia with triple fuel firing capacibility. Planning for the power plant started in late 1970 by NEB while the construction work commenced in 1981. It was constructed on a reclaimed mangrove swampland. The plant is officially opened by Sultan Selangor on 14/3/1987. After about 25 year of operation under LLN and TNB, KEV is formed and fully run as an IPP with the equity of 60% TNB and 40% Malakoff.

Read more
icon

Country

icon

City (Headquarters)

Klang

icon

Industry

icon

Founded

2004

icon

Social

  • icon

Employees statistics

View all employees

Potential Decision Makers

  • Shift Manager

    Email ****** @****.com
    Phone (***) ****-****
  • Hse and Regulatory Manager

    Email ****** @****.com
    Phone (***) ****-****
  • Lead Technician for Balance of Plant

    Email ****** @****.com
    Phone (***) ****-****
  • Senior Engineer – Planning and Technical Risk Management

    Email ****** @****.com
    Phone (***) ****-****

Technologies

(18)

Reach decision makers at Kapar Energy Ventures Sdn Bhd

Free credits every month!

My account

Sign up now to uncover all the contact details