ALYSJ JV

www.alysj.qa

ALYSJ Joint Venture, which is led by AKTOR and includes L&T, Yapi Merkezi,STFA and Al Jaber Engineering’s participation. A consortium led by Greek construction major Ellaktor has been awarded a USD 4.4 bn contract for the design and construction of the Doha Metro Gold Line. The project is expected to be completed by August 2018. Ellaktor subsidiary Aktor, which has a 32 percent stake in the Alysj joint venture, has signed the contract for the project, which is expected to take 54 months to complete, an Ellaktor statement said. The Gold Line is by far the largest single construction package of the Doha Metro. It traverses Doha from East to West. Doha metro routes The Gold Line will connect the airport’s northern part with Souq Waqif, Msheireb, Bin Mahmoud, Al Sadd and Al Waab. The project includes 32-km of bore tunnelling with a diameter of six metres, tunnelling lined with approximately 128,000 segments, six tunnel boring machines (TBMs) utilised simultaneously, 13 underground stations fitted out with high-end finishes and state of the art mechanical, engineering and plumbing (MEP) systems, 2.5 million cubic metres of excavations for the stations and one million cubic metres of concreting. The project also includes traffic and utilities diversions

Read more

Reach decision makers at ALYSJ JV

Lusha Magic

Free credit every month!

ALYSJ Joint Venture, which is led by AKTOR and includes L&T, Yapi Merkezi,STFA and Al Jaber Engineering’s participation. A consortium led by Greek construction major Ellaktor has been awarded a USD 4.4 bn contract for the design and construction of the Doha Metro Gold Line. The project is expected to be completed by August 2018. Ellaktor subsidiary Aktor, which has a 32 percent stake in the Alysj joint venture, has signed the contract for the project, which is expected to take 54 months to complete, an Ellaktor statement said. The Gold Line is by far the largest single construction package of the Doha Metro. It traverses Doha from East to West. Doha metro routes The Gold Line will connect the airport’s northern part with Souq Waqif, Msheireb, Bin Mahmoud, Al Sadd and Al Waab. The project includes 32-km of bore tunnelling with a diameter of six metres, tunnelling lined with approximately 128,000 segments, six tunnel boring machines (TBMs) utilised simultaneously, 13 underground stations fitted out with high-end finishes and state of the art mechanical, engineering and plumbing (MEP) systems, 2.5 million cubic metres of excavations for the stations and one million cubic metres of concreting. The project also includes traffic and utilities diversions

Read more
icon

Country

icon

City (Headquarters)

Ar Rayyān

icon

Employees

10001+

icon

Founded

2014

icon

Social

  • icon

Employees statistics

View all employees

Potential Decision Makers

  • Project Director

    Email ****** @****.com
    Phone (***) ****-****
  • Lead Architect

    Email ****** @****.com
    Phone (***) ****-****
  • Procurement Manager

    Email ****** @****.com
    Phone (***) ****-****
  • Commercial Manager - Tunneling

    Email ****** @****.com
    Phone (***) ****-****

Reach decision makers at ALYSJ JV

Free credits every month!

My account

Sign up now to uncover all the contact details