INFRA-LEX LTD

www.infra-lex.co.uk

One of biggest challenges in new builds is getting block work and plaster dry enough for the next stage of work. When that is delayed your construction schedule goes to pot. Traditional drying methods include use of fans, heaters and dehumidifiers which are time consuming partly because they can only be run during normal working hours. What’s more if you try and accelerate the drying process it can lead to cracking and feathering in plaster and incomplete drying of block work leading to redecoration post occupation. The Infra-Lex Mobile Dri-IR® and Corner Dri-IR® provide cost effective, speedy and silent drying solutions that can be safely operated unattended 24/7. They dry the parts that other methods struggle to reach. Gets walls/screed dry and construction projects back on track. Fix water-related snags quickly and efficiently whilst keeping affected properties occupied and getting customers’ lives back to normal as rapidly as possible. 1. Faster drying of block work resulting in earlier dry-lining and decorating 2. No “feathering” or “cracking” of plaster resulting from the drying 3. 1 x Mobile Dri-IR® is sufficient for a room up to 12m² 4. Mobile Dri-IR® 110V, 0.725kW, 6.6A so can be used with on-site power generation 5. Corner Dri-IR® 240V, 0.350kW, 1.5A so up to 7 units can be operated from one power socket 6. Robust, durable stainless-steel construction 7. Can be handled by one person with minimal training 8. Silent so can be used in occupied buildings https://youtu.be/bPfut0HcECU https://youtu.be/HDeeB89EyvI

Read more

Reach decision makers at INFRA-LEX LTD

Lusha Magic

Free credit every month!

One of biggest challenges in new builds is getting block work and plaster dry enough for the next stage of work. When that is delayed your construction schedule goes to pot. Traditional drying methods include use of fans, heaters and dehumidifiers which are time consuming partly because they can only be run during normal working hours. What’s more if you try and accelerate the drying process it can lead to cracking and feathering in plaster and incomplete drying of block work leading to redecoration post occupation. The Infra-Lex Mobile Dri-IR® and Corner Dri-IR® provide cost effective, speedy and silent drying solutions that can be safely operated unattended 24/7. They dry the parts that other methods struggle to reach. Gets walls/screed dry and construction projects back on track. Fix water-related snags quickly and efficiently whilst keeping affected properties occupied and getting customers’ lives back to normal as rapidly as possible. 1. Faster drying of block work resulting in earlier dry-lining and decorating 2. No “feathering” or “cracking” of plaster resulting from the drying 3. 1 x Mobile Dri-IR® is sufficient for a room up to 12m² 4. Mobile Dri-IR® 110V, 0.725kW, 6.6A so can be used with on-site power generation 5. Corner Dri-IR® 240V, 0.350kW, 1.5A so up to 7 units can be operated from one power socket 6. Robust, durable stainless-steel construction 7. Can be handled by one person with minimal training 8. Silent so can be used in occupied buildings https://youtu.be/bPfut0HcECU https://youtu.be/HDeeB89EyvI

Read more
icon

City (Headquarters)

Horsham

icon

Employees

1-10

icon

Founded

2014

icon

Social

  • icon

Employees statistics

View all employees

Potential Decision Makers

  • Part - Time Chief Executive Officer and Co - Founder

    Email ****** @****.com
    Phone (***) ****-****
  • Technology and Strategy Director

    Email ****** @****.com
    Phone (***) ****-****

Technologies

(11)

Reach decision makers at INFRA-LEX LTD

Free credits every month!

My account

Sign up now to uncover all the contact details